Resource Reallocation Models for Deterministic Network Construction Projects


Avner BEN-YAIR
Nitzan SWID
Dimitri GOLENKO-GINZBURG
Olga GRECHKO


Keywords

network construction project, hierarchical budget reallocation models, time-cost optimization problems, R&D network projects

Abstract

Hierarchical budget reallocation models for a portfolio of construction network projects with deterministic activity durations are considered. Optimal reallocation models both at the company level and at the project level are developed.